How long does a custom light fixture take to make and ship?

Production takes 15 to 30 days after you approve the drawings. Shipping is separate: 15 to 20 business days for a standard parcel, or 35 to 45 days by sea for any piece whose packed size exceeds 27.5 inches (70 cm). Allow six to ten weeks door to door for a standard custom chandelier, and ten to fourteen weeks for an oversized one.

The short version

  • Production: 15–30 days, counted from the day you approve the production drawings.
  • Order processing before dispatch: 0–7 business days.
  • Standard shipping: 15–20 business days.
  • Sea freight (packed size over 27.5 in / 70 cm): 35–45 days.
  • Minimum order quantity: none. A single piece can be produced.

What happens before the 15 to 30 day production clock starts?

Three steps come first, and they are the part most people underestimate. You send a sketch, photograph, or 3D model. The design team converts it into detailed production drawings that specify dimensions, finish, material, and light source. You review and approve those drawings. Only then does the 15 to 30 day production window open. Engineers also review the design for safety and manufacturability during this stage, which can send a drawing back for revision.

Budget one to two weeks for this phase on a straightforward piece. Each round of drawing revisions adds to it, and revisions are the single largest source of schedule slip on a custom order.

Why do oversized fixtures take 35 to 45 days to ship?

The threshold is a packed size of 27.5 inches (70 cm). Anything larger cannot move as a standard parcel and goes by sea freight, which takes 35 to 45 days instead of 15 to 20 business days. This is a packaging measurement, not the fixture’s own width, so a wide but shallow fixture may still ship standard while a compact but deep one may not.

In practice, most chandeliers over roughly 39 inches across cross the threshold. A 74-inch Lyla Linear Chandelier will always travel by sea; a 7-inch solid brass sconce never will.

Does a single custom piece take longer than a production run?

No. The 15 to 30 day production window is the same for one fixture as for fifty, because the setup work — drawings, tooling, finish sampling — is identical either way. What changes with quantity is unit price, not lead time. Josenart has no minimum order requirement, so a one-off piece for a single room is produced on the same schedule as a hotel order.

Lead time by fixture size

Fixture size Ships by Production Transit Door to door Example from our catalogue
Wall sconces, small pendants Standard parcel 15–30 days 15–20 business days ~6–8 weeks Solid Brass Sconce with Reflection Shade, 7 in, $188
Mid-size chandeliers to ~40 in Usually sea freight 15–30 days 35–45 days ~9–12 weeks Alabaster Cylindrical Chandelier, 39 in, $928
Large chandeliers 40–72 in Sea freight 15–30 days 35–45 days ~10–13 weeks Paloma Chandelier, 40 in, $1,920
Oversized, over 72 in Sea freight 15–30 days 35–45 days ~10–14 weeks Elegance Crystal Chandelier, 94.5 in, $3,389

Door-to-door figures include 0–7 business days of order processing and assume one round of drawing approval with no revisions.

How we measured this

Josenart has manufactured lighting since 2011. We currently produce 1,084 fixtures across our own catalogue — 356 wall sconces, 266 chandeliers, 177 pendants, and 88 flush mounts — and the sizes and prices in the table above are pulled from live product pages, not from a generic industry estimate.

The 15 to 30 day production figure and the 27.5 inch sea-freight threshold are the numbers we quote to customers and publish on our customization service page. We have not adjusted them to look faster than they are: the sea-freight leg genuinely takes 35 to 45 days, and a fourteen-week total on a 94-inch chandelier is a realistic outcome, not a worst case.

Common mistakes that add weeks

  • Sending a photograph with no dimensions. A reference image without a target width or drop length adds at least one drawing round, typically 5 to 7 days.
  • Approving drawings before checking ceiling height. Changing drop length after production starts means restarting the 15 to 30 day window.
  • Assuming the fixture width decides the shipping mode. The 27.5 inch threshold is a packed measurement; ask which mode applies before you commit to a date.
  • Ordering for a fixed installation date with no buffer. Add two weeks to any quoted total if the date is not movable.
  • Treating a custom finish as a separate lead time. Antiquing, brushing, and electroplating are handled inside the production window and do not extend it.

Frequently asked questions

Is there a minimum order quantity for a custom light fixture?

No. Josenart has no minimum order requirement and a single piece can be produced. The same 15 to 30 day production window applies whether you order one fixture or fifty; unit price changes with quantity, but lead time does not.

How long does production take after I approve the drawings?

15 to 30 days, depending on design complexity and the current production schedule. The clock starts the day you approve the production drawings, not the day you first send your sketch.

How long does shipping take on top of production?

15 to 20 business days for standard parcels. Any fixture whose packed size exceeds 27.5 inches (70 cm) ships by sea and takes 35 to 45 days. Orders are processed for 0 to 7 business days before dispatch.

Can you build a fixture from my own drawing or 3D model?

Yes. Josenart manufactures from drawings, 3D models, or photographs. Engineers review the design for safety and manufacturability before production begins, and the design team prepares detailed production drawings for your approval first.

What is the total time from first email to delivered fixture?

Six to ten weeks for a standard-size custom fixture, and ten to fourteen weeks for an oversized one that must travel by sea. Drawing revisions are the largest variable and sit entirely on the approval side of the timeline.

Does a custom finish or a custom light source add time?

Custom finishes such as antiquing, brushing, or electroplating are handled inside the 15 to 30 day window. Custom colour temperature or dimming specification also fits inside it. Neither is billed as a separate lead time.


Written by the Josenart production team. Last updated 30 August 2026.

Methodology: production and shipping figures are the published lead times Josenart quotes to customers. Catalogue counts and product prices were read from live product pages on 30 August 2026 and are subject to change. Where a range is given, it reflects genuine variance in design complexity and production scheduling rather than a marketing estimate.